Hello, welcome to visit Guangzhou Flying Butterfly Stage Lighting Equipment Co., LTD's official website!
ENGLISH
中文
Language Selection:
TECHNICAL SUPPORT
First to understand the needs of the customers, listen to the customer with an open mind.
After-sales Service Technical Help Download News
The stage lighting equipment maintenance?
Release Date:[2016/6/24 16:50:29]   Total read [2474] Times

Light matters needing attention

 

1 and half an hour before the opening, open all equipment, low temperature preheating, test all the equipment and lines at the same time. Low temperature state refers to a dim light can;

 

2, warmed up after fifteen minutes to zero in all equipment, equipment cooling, cooling time not less than 15 minutes;

 

3, after cooling, can be formally entered the stage of music performance;

 

4, the performance, after the guests leave, lighting engineer should shut down all equipment, and make the equipment cooling 15 to 20 minutes, then equipment for storage or mask, juicers before departure.

 

Lighting equipment maintenance is more complicated than the level of sound, is trivial, basically do daily routine detection, regular weekly, monthly equipment maintenance and debugging appropriately;

 

Conventional detection range includes:

 

1, whether or not the bulb light properly;

 

2, all the devices of attachment is normal;

 

3, all the equipment whether can normal use, including light switch, color changer control, motion and so on is normal,

 

4, DMX512 signal whether can normal control lamps and lanterns;

 

5, special equipment is normal use, and fill them with the required materials, such as: machine, fog machine, snow machine, bubble machine, etc.

 

Regular testing

 

Regular testing in addition to routine monitoring all project also note the following points

 

1, in the weeks to detect when the connection to the main test equipment, including power cords, DMX512 cords, etc., and see whether there is loose, whether there is a breakpoint, etc.

 

2, when tested for weeks at the same time, should be more fully adjust the lamp and DMX512 programming;

 

Monthly equipment maintenance and proper adjustment

 

An appropriate adjustment of the every month in addition to routine monitoring and testing of all work a week, it will be a very meticulous work, need to coordinate multiple departments, such as actors, band, weak current, security, cleaning, etc., at the same time in the month test, to complete the following work.

 

1, light adjustment; Because in use there will be a part of the lamp, the change of movement or guest area lead to light changes, so in each month for the adjustment of the equipotential, of course, also include DMX512 signal control amount;

 

2, the testing of mechanical equipment, including the amount of motor, the color changer, special equipment of nozzle, etc.

 

3, check all the lines. To detect whether there is a breakpoint, breakage, leakage, because some human factors is in use to avoid lines appear all sorts of unexpected circumstances, such as ferrous wire is breaking, often plug wire, or about breakpoints, occasionally because and beverage line leakage or short circuit, etc., so the test should be very careful. The weak current testing needed to cooperate to complete;

 

4, clean lamps and lanterns of internal and external dust and garbage. Light itself will have some rubbish in use, such as residue inside the lamp bulb explosion of garbage, or other foreign minister time teach, special effects in the audience area machinery easy to fall into some rubbish, such as ribbon bar, scales, drinks the residual liquid, and so on. So be scraped clean lamps and lanterns outside of garbage and sewage, and clear the trash inside the lamp, this link need cleaning to cooperate;

 

5, check all fire protection equipment. Lighting, audio circuits is one of the most concentrated in the type of work, high voltage into the weak current, relevant equipment, related wire more, so fire is a top priority in the lights work, in the monthly routine check, should cooperate with security department, for all fire protection facility, fire fighting equipment to conduct a comprehensive inspection, monitoring scope includes the normal degree of fire-fighting equipment, fire fighting equipment choice whether normal, whether in the warranty period, etc.

 

In addition to the daily monitoring, test every week, every month comprehensive inspection, lighting engineers must know about all of the equipment and the environment is very, do please timely treatment, so as to have the good visual environment at the same time there is enough security.

【Font:Big Middle Small】【Printing this page】 【Back】【Top】【Close
CONTACT US

Service Hotline: 18922706009   Whatsapp:+8618922706009

E-mail:wfw04@163.com
Addr.:No.2, Qinglong Dongyi Street, Dalongtou Village, Jianggao Town, Baiyun District, Guangzhou
Website: http://m.55611a.com

SHARE
粵ICP備19113232號

友情鏈接

主站蜘蛛池模板: 欧美成人秋霞久久AA片| 搡女人免费视频大全| 特级毛片在线播放| 老妇高潮潮喷到猛进猛出| 好吊色永久免费视频大全| eeuss草民免费| 91在线看片一区国产| 99riav视频国产在线看| a毛片免费观看完整| 99久久精品免费精品国产| 99re在线视频播放| 97国产在线视频| 337p日本欧洲亚洲大胆裸体艺术| 天堂在线免费观看| 777精品视频| 视频在线观看一区二区三区| 色与欲影视天天看综合网| 精品性高朝久久久久久久| 精品女同一区二区三区在线| 男人边做边吃奶头视频| 欧美日韩在线国产| 日韩成人免费在线| 我要看特级毛片| 天堂网www中文在线| 国产精品日韩专区| 国产精品欧美一区二区| 国产中文欧美日韩在线| 国产三级在线观看视小说| 日本精品www色| 极品色αv影院| 日本免费一区二区三区最新vr | 久久综合亚洲色hezyo国产| 久久精品国产精品亚洲精品| 久久九九国产精品怡红院| 中文字幕免费视频精品一| a级毛片免费高清视频| 丁香婷婷亚洲六月综合色| 久热中文字幕在线精品免费 | 99精品国产一区二区| 狠狠色伊人亚洲综合网站色| 精品无码一区二区三区爱欲|
Service
Service